Relay Interface Board Installation Guide
4
Installation
These instructions assume the controller has previously been installed.
Tools Needed
Four, #6 screws
Screwdriver
Mounting
1. Choose a mounting location large enough to accommodate the RIB, the I/O
board or boards, the ribbon cable or cables and wires that connect them.
2. Place the RIB in a suitable location to be mounted and use a pencil to trace
around the plastic standoffs or use the dimension diagram in Figure 1 to posi-
tion the mounting holes.
3. Drill and tap #6-32 holes in the marked locations.
4. Place the Relay Interface Board in the mounting location and insert the #6
screws in the plastic standoffs.
5. Tighten the screws.
Comentários a estes Manuais